All concepts →At a hydro electric power plant site, available head and flow rate are $$24.5$$ $$m$$ and $$10.1{m^3}/s$$ respectively. If the turbine to be installed is required to run at $$4.0$$...
In a hydroelectric station, water is available at the rate of $$175{m^3}/s$$ under a head of $$18m.$$ The turbines run at a speed of $$150$$ $$rpm$$ with overall efficiency of $$82...
In terms of speed of rotation of the impeller $$N$$, discharge $$Q$$ and a change in total head $$H$$, through the machine,the Specific Speed for a pump is ________________ (fill t...
A Hydro turbine is required to give $$25$$ $$MW$$ at $$50$$ $$m$$ head and $$90$$ $$rpm$$ runner speed. The laboratory facilities available, permit testing of $$20$$ $$kW$$ models...
A $$7MW$$ hydro turbine working under a head of $$10$$ $$m$$ at a rotational speed of $$125$$ $$rpm$$ is to be designed and developed by conducting model tests in a laboratory. Max...
Identify the type of turbo machinery for the following case. Specify the reasons. Power developed $$=430$$ $$kW;$$ Operating head $$=300$$ $$m;$$ Speed $$=600$$ $$rpm.$$