GATE Mechanical Engineering · Industrial Engineering - Quality Control · 2002-2023

8
PYQs
75%
keyed
0
elite explanations
7
years appeared

Study anchor

Source-book anchor pending for this concept.

Practice action

Start latest PYQ

PYQs in this concept

All concepts →
2023 Q53

A part, produced in high volumes, is dimensioned as shown. The machining process making this part is known to be statistically in control based on sampling data. The sampling data...

hard
2021 Q20

Robot Ltd. wishes to maintain enough safety stock during the lead time period between starting a new production run and its completion such that the probability of satisfying the c...

mediumanswer key
2021 Q35

Activities A, B, C and D form the critical path for a project with a PERT network. The means and variances of the activity duration for each activity are given below. All activity...

mediumanswer key
2019 Q4

The lengths of a large stock of titanium rods follow a normal distribution with a mean ($\mu$) of 440 mm and a standard deviation ($\sigma$) of 1 mm. What is the percentage of rods...

mediumanswer key
2018 Q26

Let X1, X2 be two independent normal random variables with means μ1, μ2 and standard deviations σ1, σ2, respectively. Consider Y = X1 – X2; μ1 = μ2 =1, σ1 = 1, σ2 = 2. Then,

mediumanswer key
2014 PYQ

A nationalized bank has found that the daily balance available in its savings accounts follows a normal distribution with a mean of Rs. $$500$$ and a standard deviation of Rs. $$50...

easy
2013 PYQ

Let $$X$$ be a normal random variable with mean $$1$$ and variance $$4.$$ The probability $$P\left\{ {X < 0} \right\}$$ is

easyanswer key
2002 PYQ

A project consists of three parallel paths with mean durations and variances of $$(10,4), (12,4)$$ and $$(12,9)$$ respectively. According to the standard $$PERT$$ assumptions, the...

mediumanswer key