A water resources project with an expected life of 25 years has to be designed for an acceptable risk of $5 \%$ against a design flood. The return period for the design flood (in years) is __________ (rounded off to the...
A flood control structure having an expected life of n years is designed by considering a flood of return period T years. When T = n, and n $$\to$$ $$\infty$$, the structures hydrologic risk of failure in percentage is _...
A 1-hour rainfall of 10 cm has a return period of 50 years. The probability that 1 hour of rainfall 10 cm or more will occur in each of two successive years is
The return period for the annual maximum flood of a given magnitude is 8 years. The probability that this flood magnitude will be executed once during the next 5 years is