Concept drill
Webster's method
GATE Civil Engineering · Transportation Engineering / Traffic Flow · 2021-2022
2
PYQs
100%
keyed
0
elite explanations
2
years appeared
Study anchor
Source-book anchor pending for this concept.
Practice action
Start latest PYQPYQs in this concept
All concepts →2022 Q65
The lane configuration with lane volumes in vehicles per hour of a four-arm signalized intersection is shown in the figure. There are only two phases: the first phase is for the Ea...
hardanswer key
2021 Q25
A signalized intersection operates in two phases. The lost time is 3 seconds per phase. The maximum ratios of approach flow to saturation flow for the two phases are 0.37 and 0.40....
mediumanswer key