2025 Q18

The recommended minimum traffic growth rate and design period considered for structural design of flexible pavements for national highways in India as per IRC 37:2018 is ________ p...

mediumanswer key
2025 Q28

Which of the following statements is/are INCORRECT?

mediumanswer key
2025 Q43

Match the following in Column I with Column II. Column I (1) Vehicle Damage Factor (2) Passenger Car Unit (3) Perception Reaction Time (4) California Bearing Ratio Column II A. Sta...

mediumanswer key
2025 Q50

The free flow speed of a highway is 100 km/h and its capacity is 4000 vehicle/h. Assume speed density relation is linear. For a traffic volume of 2000 vehicle/h, choose all the pos...

mediumanswer key
2025 Q65

During determination of the bulk specific gravity of compacted bituminous specimen, the mass in air of the specimen is 1260 g and volume is 525 cm³. The density of water is 1.0 g/c...

mediumanswer key
2022 Q35

The base length of the runway at the mean sea level (MSL) is 1500 m. If the runway is located at an altitude of 300 m above the MSL, the actual length (in m) of the runway to be pr...

mediumanswer key
2022 Q62

A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase...

mediumanswer key
2022 Q63

Assuming that traffic on a highway obeys the Greenshields model, the speed of a shockwave between two traffic streams (P) and (Q) as shown in the schematic is _________ kmph. (in i...

mediumanswer key
2022 Q63

At a traffic intersection, cars and buses arrive randomly according to independent Poisson processes at an average rate of 4 vehicles per hour and 2 vehicles per hour, respectively...

hardanswer key
2019 Q21

The maximum number of vehicles observed in any five minute period during the peak hour is 160. If the total flow in the peak hour is 1000 vehicles, the five minute peak hour factor...

mediumanswer key