Concept drill
Slope Correction
GATE Civil Engineering · Surveying - Chain Surveying · 1990-2022
4
PYQs
100%
keyed
0
elite explanations
3
years appeared
Study anchor
Source-book anchor pending for this concept.
Practice action
Start latest PYQPYQs in this concept
All concepts →2022 Q24
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The corrected horizontal length (in m) of...
mediumanswer key
2022 PYQ
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The corrected horizontal length (in m) of...
mediumanswer keybasic explanation
2019 Q35
A survey line was measured to be 285.5 m with a tape having a nominal length of 30 m. On checking, the true length of the tape was found to be 0.05 m too short. If the line lay on...
mediumanswer key
1990 PYQ
The required slope correction for a length of 60m, along a gradient of 1 in 20 is
easyanswer key