Concept drill
linear measurement
GATE Civil Engineering · Linear Measurement · 1991-2022
2
PYQs
50%
keyed
0
elite explanations
2
years appeared
Study anchor
Source-book anchor pending for this concept.
Practice action
Start latest PYQPYQs in this concept
All concepts →2022 PYQ
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The corrected horizontal length (in m) of...
mediumanswer keybasic explanation
1991 PYQ
The length of a baseline measured on ground at an elevation of 300m above mean sea level is 2250 m. The required correction to reduce to sea level length. (given the radius of eart...
easy