2026 Q56

For a clayey soil stratum, the time required for degree of consolidation from 25 % to 50 % is 30 days. The total time (in days) required for 90 % degree of consolidation of the sam...

mediumanswer key
2026 Q57

A circular pile of 600 mm diameter and 6 m length is embedded in a saturated clayey soil. Undrained cohesion of the soil is 80 kPa. Unit weight of the soil is 19.20 kN/m³. The adhe...

mediumanswer key
2025 Q57

A 4 x 4 group pile, with each pile 20 m long and 500 mm in diameter, is installed in a square pattern in a clayey soil, as shown in the figure. The average unconfined compressive s...

mediumanswer key
2025 Q57

A clayey soil has a moisture content of 18%, a specific gravity of soil solids of 2.74, and a degree of saturation of 65%. The soil soaks up water during a rain event, and the degr...

mediumanswer key
2025 PYQ

The most suitable test for measuring the permeability of clayey soils in the laboratory is ___________

easyanswer keybasic explanation
2023 Q58

A vertical trench is excavated in a clayey soil deposit having a surcharge load of 30 kPa. A fluid of unit weight 12 kN/m³ is poured in the trench to prevent collapse as the excava...

mediumanswer key
2019 Q25

Construction of a new building founded on a clayey soil was completed in January 2010. In January 2014, the average consolidation settlement of the foundation in clay was recorded...

hardanswer key
2018 Q31

A 0.5 m × 0.5 m square concrete pile is to be driven in a homogeneous clayey soil having undrained shear strength, cu = 50 kPa and unit weight, γ = 18.0 kN/m³. The design capacity...

mediumanswer key